
News & Success Stories

Heat exchanger delivered to Trinidad.
News
/
June 2019
With a weight of 135 tons and 53 kilometers of pipes installed, ACE Apparatebau construction & engineering GmbH secured a major contract.
Read More

Safurex®
News
/
March 2019
In March 2019, SBN produced the first high-pressure stripper made out of the brand new Safurex® Star and Safurex® Degree materials.
Read More

We repair the “unrepairable”
News
/
October 2016
The situation was critical, the solution creative. In 2016, the unique repair of a pool condenser tube sheet, severely damaged by flow-accelerated corrosion, not only prevented loss of containment, it also set new standards for mastering such highly delicate repairs.
Read More
Meet Christof Group at
Utrecht
/
Netherlands
/
16.-19.03.2021
STAC Symposium 2021